Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | CPI (Centre for Process Innovation) |
| Main Category: | Goods |
| Procurement Method: | Open procedure |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 9 April 2024 |
| Application Deadline: | 5 March 2024 |
| Procurement ID (OCID): | ocds-b5fd17-e7aed720-0004-4161-8413-903288d11a70 |
| Notice Reference: | b60045c7-6cb4-4d81-b6b4-9c9fc2e11f04-739311 |
View Original Notice
Access the full notice on the official portal
CPI requires a replacement chiller unit on the upper plant deck of The Neville Hamlin Building. The current Chilled water system has a Chilled water tank containing 30% Propyl alcohol and is circulated around the sites plant for cooling capacity. Cooling fluid temperature is set to 7 °C on supply to the plant. CPI have a requirement for the existing two chillers to be repaired, restoring capacity to OEM specification.
Published contracts in the last 12 months
49
total contracts
£2.9m
total value
£190,482
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
5 March 2024
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →