Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | UNIVERSITY OF MANCHESTER |
| Main Category: | Works |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £550,000 |
| Release Date: | 26 July 2023 |
| Application Deadline: | 11 August 2023 |
| Procurement ID (OCID): | ocds-b5fd17-a1ba94df-2e5e-4ba2-80b6-a139fc3adef1 |
| Notice Reference: | 16d4598c-247f-401c-86be-11542830e34b-665927 |
All 2 notices for this procurement, oldest first.
Jodrell Bank IT Network/LAN upgrade
Jodrell Bank IT Network/LAN upgrade
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
The Jodrell Bank Centre for Astrophysics is the astronomical research centre of The University of Manchester and operates e-MERLIN, the UK's national radio astronomy facility. Jodrell Bank was awarded UNESCO World Heritage Site status in 2019, and the consultant needs to be aware of the heritage status of the site. Jodrell Bank is a world leader in radio astronomy-related research and technology development but also carries out research across the electromagnetic spectrum and in theoretical topics. A LAN Switch Refresh project has been progressed for the main buildings however the circa 60 3rd party unmanaged switches that are connected to single data ports within the buildings will not be replaced. There is a mixture of 5, 8, 12, 16, 24 & 32 port switches on and under desks, in cupboards, equipment racks etc. This situation is a concern from a security, management, network connectivity and process perspective. Moving to a Wi-Fi only option is not possible due to the sensitive nature of the radio telescopes. However, there may be a requirement for occasional Wi-Fi hotspots for guests and events. A range of options have been considered for Network Modernisation, and a preferred option identified. This involves removing all the 3rd party unmanaged switches and running additional data cables to the location of the existing comms cabinets. This will bring Jodrell Bank in line with the rest of the University's modernized network, removing old equipment, improving network stability, an enabling monitoring of all areas of the network. The upgrade is of high importance, with the works aimed to be completed by Spring 24.
Published contracts in the last 12 months
11
total contracts
£13.4m
total value
£1,672,500
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
11 August 2023
Closed
Estimated Value
£550,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →