Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Amendment |
| Buyer: | Dover Harbour Board |
| Main Category: | Works |
| Procurement Method: | Negotiated procedure without prior publication (above threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £5,000,000 |
| Release Date: | 5 June 2023 |
| Application Deadline: | 21 July 2023 |
| Procurement ID (OCID): | ocds-b5fd17-56df7eef-5c5c-499c-8ae8-dfe2b2a24d12 |
| Notice Reference: | 775bdf8d-86b1-449e-8015-ac3c82677ec8-650898 |
All 2 notices for this procurement, oldest first.
Rockfall Protection System Installation
Rockfall Protection System Installation
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
The Contractor provides the management and implementation of the Rockfall Protection Systems 'Phase II - Phase V', summarised below: • Phase II (Envisaged Commencement within 2023) The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 223m (linear) of a 5m high (projection) GBE-500A rockfall barrier (and approximately 450m2 of a TECCO Stainless Steel (G65/3) slope stabilisation system) manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE). • Phase III Envisaged Commencement within 2024) The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 191m (linear) of a 3m high (projection) GBE-500A rockfall barrier manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE). • Phase IV Envisaged Commencement within 2025) The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation systems and the replacement installation of approximately 2750m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE). • Phase V Envisaged Commencement within 2026) The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation system and the replacement installation of approximately 2400m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system (and approximately 12m2 of a SPIDER 'S3-130' rock protection system), manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).
Published contracts in the last 12 months
20
total contracts
£6.1m
total value
£381,250
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
21 July 2023
Closed
Estimated Value
£5,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →