Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | THAMES WATER UTILITIES LIMITED |
| Main Category: | Works |
| Procurement Method: | Negotiated procedure with prior call for competition |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £500,000,000 |
| Release Date: | 16 February 2023 |
| Application Deadline: | 20 March 2023 |
| Procurement ID (OCID): | ocds-h6vhtk-03a637 |
| Notice Reference: | 004786-2023 |
All 3 notices for this procurement, oldest first.
Non-Infrastructure Medium Project Work
Non-Infrastructure Medium Project Work
Non-Infrastructure Medium Project Work
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
Non-infrastructure MEICA and Civils ~ Medium (RW1) Project Work. TWUL are procuring delivery capability for Non-Infrastructure projects. TWUL recognises non-infrastructure as nominally all above ground plant, equipment, structures and process; the expected scope of works spans Thames Water's water and wastewater non-infrastructure (treatment) assets across the Thames Water region. The Non-infrastructure scope includes refurbishment, replacement and provision of new potable water and wastewater treatment assets including service and storage reservoirs Water non infrastructure scope includes but is not limited to: - refurbishment, replacement and provision of new potable ground and surface water production assets such as enhanced slow sand filter performance, - disinfection, - surge protection, - chemical dosing, - supervisory control and data acquisition (SCADA), - run-to-waste facilities, - cartridge filters and UV, - increased power resilience, - inspection and maintenance of existing service and storage reservoirs. Wastewater non-infrastructure scope includes but is not limited to: - refurbishment, replacement and provision of new treatment facilities such as inlet works, - storm water storage, - event duration monitors, - settlement tanks, - biological treatment, tertiary treatment, sludge treatment including thermal hydrolysis process (THP), - digester roof replacement, - combined heat and power (CHP), - chemical dosing, - phosphorous removal, - odour control, - SCADA, - increased power resilience.
Published contracts in the last 12 months
55
total contracts
£14798.3m
total value
£360,933,073
average contract size
Typical categories
Design and manufacture of an Innovative Anaerobic Wastewater Treatment system
THAMES WATER UTILITIES LIMITED · WAC-579272
Fire Alarm Installation and Associated Works
THAMES WATER UTILITIES LIMITED · WAC-579532
Main Works Contract for White Horse Reservoir
THAMES WATER UTILITIES LIMITED · WAC-544993
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
20 March 2023
Closed
Estimated Value
£500,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →