Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | National Grid Electricity Transmission PLC |
| Main Category: | Services |
| Procurement Method: | Negotiated procedure with prior call for competition |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 8 November 2022 |
| Application Deadline: | 8 December 2022 |
| Procurement ID (OCID): | ocds-h6vhtk-037fe7 |
| Notice Reference: | 031507-2022 |
All 2 notices for this procurement, oldest first.
Western Link Interim Depth of Burial (DoB) Marine Survey
Western Link Interim Depth of Burial (DoB) Marine Survey
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
As part of the ongoing Operations and Maintenance, an interim depth of burial marine survey needs to be produced which is specific to the parts of the cable route which demonstrates industry best practice for bathymetric and geophysical surveys. The general requirement is for a marine bathymetric and geophysical survey along an approximately 390km route comprising two separated cables from Hunterston in Scotland to the Wirral, England over an approximately 80m wide corridor. The interim surveys are of areas of interest e.g. crossings, areas of mobile sediments and intense fishing etc. and comprise approximately 30-50% of the total route length. To register your interest in this procurement event and to obtain the pre-qualification documentation applicants are to email Rebecca.Pearson@nationalgrid.com using the wording 'Registering Interest for Western Link Interim Marine Survey' and include in the body of the message (if you have them) your Ariba AN number (network ID), name, email address and contact phone number for all contacts within your organisation who will need to receive Ariba messages and administer your online submissions. Following receipt of this information National Grid will invite you to the Ariba event where all of the pre-qualification documentation is contained including further instructions.
Document pack· 1 file
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
8 December 2022
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →