Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Buyer: | BlueLight Commercial |
| Main Category: | Services |
| Procurement Method: | Open procedure |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £50,000 |
| Release Date: | 31 May 2022 |
| Application Deadline: |
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
30 June 2022
Closed
Estimated Value
£50,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| 30 June 2022 |
| Procurement ID (OCID): | ocds-b5fd17-79e10d48-9a65-442d-b6b2-502a135ca8f0 |
| Notice Reference: | 3cb67158-4f9e-436f-a0a3-da36f3d0ae79-543408 |
View Original Notice
Access the full notice on the official portal
This requirement is for both preventative and reactive maintenance of fuel tank assets. The preventative maintenance is for routine inspection and maintenance and any repairs arising from the routine visits to fuel farm installations and mobile bowsers at various NPAS bases in England and Wales. Maintenance and inspection of all fuel installations shall be in accordance with the Civil Aviation Authority's CAP 748 (Aviation Fuels at Aerodromes) and all work undertaken will be to the prevailing addition of JIG 4 Fuel Quality Control and Operating Standards. The core requirement is for each fuel farm or bowser to have 2 inspections per annum at 6 monthly intervals and 1 complete tank clean every 3 years unless under advisement it is not required. At each routine inspection the following shall be undertaken: 1. Calibration of all fitted gauges to 0.05% ± 2. Hose inspection and pressure test 3. Filter inspection / change as appropriate (ensuring correct filters are used is FSII is present) 4. Visual tank inspection 5. Additive calibration where FSII is present 6. Inspection and function check on fuelling equipment 7. Inspection and report on interceptors if supplier is able to do so 8. Legally compliant collection and disposal of waste aviation fuel from time to time, if supplier is able to do so. 9. ATEX/DSEAR Electrical EICR Inspection and reporting yearly. 10. Provision of full certification for items 1-5 in triplicate and report findings as appropriate for items 6, 7 and 8.
Document pack· 2 files
Published contracts in the last 12 months
14
total contracts
—
total value
—
average contract size
Typical categories