Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | THE UNIVERSITY OF CHICHESTER |
| Main Category: | Works |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £0.01 |
| Release Date: |
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
3 March 2025
Closed
Estimated Value
£0.01
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| 31 January 2025 |
| Application Deadline: | 3 March 2025 |
| Contract Start Date: | 31 May 2025 (Estimated) |
| Contract End Date: | 30 September 2025 (Estimated) |
| Contract Duration: | 4 months |
| Procurement ID (OCID): | ocds-b5fd17-5a14075e-a89b-4043-914d-9a788079cc65 |
| Notice Reference: | 4ca5cb22-72eb-4869-8c83-237420256a80-822071 |
All 2 notices for this procurement, oldest first.
Heating and Boiler Replacement
Heating and Boiler Replacement
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
The University Of Chichester has a requirement for two jobs under this tender. It is envisaged that a "best contractor" will be appointed to undertake each requirement. This may or may not be the same contractor for both Jobs. Job 1 is a plant room upgrade in our Ashling Halls of Residence. Job 2 is re-piping of the heating system in our gym area. Job 1 is to replace the existing combined heating and hot water plant, along with pipework and controls within the main plantroom. The contractor should allow for the removal and disposal of all old boiler plant and pipework along with the upgrade of the existing BMS controls to allow the new plant to operate seamlessly with the new boiler plant and associated equipment. This includes the following aspects: - boiler plant - flue system - hot water - heating - pipework - system pressurisation - controls and wiring - thermal insulation - commissioning and testing Job 2 is to replace the existing heating pipework through the gym. This includes to following aspects: - Disconnection and Removal of Existing Pipework, - Supply and Installation of New Pipework and Radiators - Connection to the Heating System in Changing Rooms - High-Level access - Thermal Insulation of New Pipework - Filling and Testing of the New Pipework - Commissioning & Testing Full details of our requirements are set out in the tender documentation in section 0.3 - 0.5. All tender documents, Questions and Answers are open to all bidders. Please send your completed submission to the University by the closing date of 3rd March 2025 at 12:00 GMT, (12 midday) to tenders@chi.ac.uk. Please note, we do not accept submissions via file transfer sites. tenders@chi.ac.uk accepts emails and attachments of up to 35MB and it is acceptable to submit in more than one email.
Document pack· 2 files
Published contracts in the last 12 months
34
total contracts
£8.8m
total value
£438,025
average contract size
Typical categories