Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Notice Type: | Pipeline / planning |
| Buyer: | Chesterfield Canal Trust Ltd |
| Main Category: | — |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Planned |
| Estimated Value (ex. VAT): | £2,900,000 |
| Release Date: | 18 October 2024 |
This Main Works package will restore around 350m of canal and associated works. In summary this will include the construction of canal channel, a lock, vehicle access bridge, the creation of Public Rights of Way (PROW) and the installation of a water supply pumping system. An overview of the works is listed below: Groundworks • Strip existing topsoil and stockpile • Installation of necessary temporary access roads and hardstanding areas to facilitate the proposed construction methodology • Implement agreed temporary protection measures to utilities • Excavation to formation levels • Testing of excavated materials as required by the remediation strategy • Stockpiling on site of suitable excavated material • Disposal off site of any materials deemed unsuitable • Installation of drainage • Placing excavated and imported materials to final profiles, including topsoil • Any other temporary works required to facilitate the proposed construction methodology, including the design of all such temporary works Canal • Construction of 350m of canal channel, including soft and hard edging • Install pumping system for water supply • Canal overflow Bellhouse Lane Bridge • Construction of new vehicular access bridge • Excavation to formation and construction of bridge foundations • Fabrication, delivery, assembly and installation of precast culvert • Formation of earth approach ramps • Road surfacing, vehicle restraint system and drainage to bridge • Surfacing and drainage to footpath approaches Lock • Construct new lock structure, including in-situ concrete, coping stones and brick facing • Manage installation of lock gates (via nominated supplier) Rights of Way • Constructing and / or maintaining temporary rights of way, including farm access • Construction, realignment or upgrade of 2.2km of footpaths • Removal of temporary footpaths and associated reinstatement • Installation only of new fingerboard signage for pedestrian routes Soft and Hard Landscaping Clay Relocation • Movement and placement of clay • Reworking of clay as per Earth Works Spec Report for clay liner CDM • Fulfilment of the Principal Contractor role as defined under CDM Regulations 2015 Site Visits A site familiarisation visit will be held WC 4 November 2024. Mid tender site visits will be held WC 25 November 2024.
Pipeline status
Not addedContract imported automatically · AI writes the response
Estimated Value
£2,900,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Application Deadline: | — |
| Procurement ID (OCID): | ocds-b5fd17-23b59906-e30c-40bc-bf68-7e2946511951 |
| Notice Reference: | 65bd8593-9292-43e7-8907-69f427a2dded-795258 |
All 3 notices for this procurement, oldest first.
Chesterfield Canal Trust - Main Works Contractor
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal