Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | UNIVERSITY OF ESSEX |
| Main Category: | Works |
| Procurement Method: | Not specified |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £8,000,000 |
| Release Date: | 23 August 2024 |
| Application Deadline: | 5 December 2022 |
| Procurement ID (OCID): | ocds-b5fd17-5ab76735-599e-45f2-90e8-3cf67a970154 |
| Notice Reference: | 21098146-20a1-485f-8bd5-bca00834e723-780120 |
All 2 notices for this procurement, oldest first.
T963 Towers Refurbishment Phase Three - Rayleigh
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
The University of Essex (the Authority) invites expressions of interest for participation in a tender process for the refurbishment of the third of six Towers, Rayleigh, at our Colchester campus. The University of Essex has already completed refurbishment works of the first two Towers on the south side of campus and over the coming five years, will refurbish the remaining four towers, on the north side of campus. The refurbishment works will provide more thermally efficient buildings, with all new services, considerably enhancing the student accommodation for many years to come. The project involves the complete removal of almost all elements to the building, only the wall and floor structures will remain intact. The existing services will be fully stripped out including all of the plant serving the building. Both of the existing lifts will be entirely removed, and remedial works undertaken to the lift shafts. All the windows and curtain walling will be removed which will require a full scaffold to the entire building. The roof will need to be replaced with the addition of thermal insulation. Added to this, internal services are failing and a major refurbishment is required in order to ensure the towers can be certified as 'safe to occupy' under the Building Safety Act and to maintain the life of the asset and preserve it for future years. The towers blocks are classed as 'higher risk' buildings under the Building Safety Act which was granted Royal Assent on the 28 April 2022. Work needs to begin as part of this project on preparing safety cases for all accommodation coming into the remit of the pending legislation. All new services are to be installed with a considerable amount of design consideration to reflect the way in which students live and operate within the building. For example, the introduction of mechanical ventilation to all communal areas and student bedrooms. The building will have a new fire detection system, combined with an all new misting sprinkler system throughout. Fire compartmentation will be given great attention both horizontally and vertically through the building. The project will also deliver new fire-fighting lifts. Within the design brief the ethos has been to implement high levels of protection to life of the occupants and to enhance the fire strategy for the building.
Published contracts in the last 12 months
42
total contracts
£276.0m
total value
£8,902,067
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
5 December 2022
Closed
Estimated Value
£8,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →