Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Buyer: | ASTILLEROS GONDAN SA |
| Main Category: | Goods |
| Procurement Method: | Competitive quotation (below threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £120,000 |
| Release Date: | 19 May 2023 |
| Application Deadline: | 2 June 2023 |
| Procurement ID (OCID): | ocds-b5fd17-2c0f35b5-ea59-40e4-bbde-8d9b2fb3eca2 |
| Notice Reference: | c72df143-6f36-4de0-b3a9-ff0bf921f382-646318 |
View Original Notice
Access the full notice on the official portal
0561 System & Equipment Requirements Fire control/station shall be arranged in the Wheelhouse, with necessary emergency stops, monitoring and controls etc. A single water monitor shall be arranged on the vessel with a dedicated pump in the hold space, as per the Machinery Arrangement. The water monitor shall have local operation and remote operation from the bridge, and remote operation of the isolation valve shall be possible. It shall be possible to get a minimum air throw of 100 meters. The water monitor pump shall be electrically driven, with variable speed. Estimated pump size/capacity is 900 m3/h at 12 bar. All material shall be corrosion resistant. The maximum velocity in in piping shall not exceed 3.5 m/s. Pump data: House - Bronze (RG5) Shaft - Duplex Stainless steel AISI329 Impeller - NiAlBz (CC333) Shaft seal - Ceramic/Nitril Bearings - Ball bearings Electric motor ≈1500 RPM / 50 Hz (IE1)
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
2 June 2023
Closed
Estimated Value
£120,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →