Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Liverpool John Moores University |
| Main Category: | Works |
| Procurement Method: | Open procedure (above threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 16 May 2023 |
| Application Deadline: | 21 April 2023 |
| Procurement ID (OCID): | ocds-b5fd17-b26cacc5-942e-47b9-9552-20a1c6bd0a21 |
| Notice Reference: | fd9fe868-ebf1-4464-a28b-e0a76ebb9f1b-645280 |
All 2 notices for this procurement, oldest first.
James Parsons 6th & 7th Floor HVAC Upgrade Works
James Parsons 6th & 7th Floor HVAC Upgrade Works
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
The scheme aims to resolve issues of overheating in IT and teaching spaces on the 6th and 7th floors of James Parsons Building, Phase 2. The works comprise of the complete refurbishment of the mechanical supply and extract ventilation system and chilled water within the spaces. The existing suspended ceilings to the labs are to be replaced with all relevant services located in the ceiling to be disconnected, removed and reinstated following the ceiling works. Generally, the electrical works consist of (but are not limited to) refurbishment of the high-level services within the spaces which includes lighting, emergency lighting, fire alarm and detection, small power, containment and electrical distribution. All works are detailed on the tender drawings, specification and in the schedule of works. The Tender documentation has been developed up to RIBA Stage 3 as outlined in the BSRIA Building Services Design Framework BG6. The Contractor shall develop the RIBA Stage 3 design through RIBA Stage 4i, 4ii and 4iii. The Contractor shall provide coordination drawings, installation/fabrication drawings and technical submittals to further develop the design up to RIBA Stage 5. The building will be occupied for the duration of the proposal construction programme, albeit at reduce capacity during the summer period. The contractor is to note that works cannot take place at certain times due to pre-arranged events as follows; Monday 14th August 2023 to Friday 18th August 2023, no construction works will be permitted on the Byrom Street Campus as clearing will take place. 3nr non-working days will need to be allowed for in the contractors programme due to University open days. Additional information: This contract has now been awarded
Published contracts in the last 12 months
56
total contracts
£10.5m
total value
£376,589
average contract size
Typical categories
John Lennon Art & Design Building Roof Refurbishment
Liverpool John Moores University · WAC-584247
John Lennon Art & Design Building Roof Refurbishment
Liverpool John Moores University · WAC-584249
RFI2601 CCTV Review, Technical Design and Video Management System - Preliminary Market Engagement
Liverpool John Moores University · WAC-581961
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
21 April 2023
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →