Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Amendment |
| Buyer: | Liverpool John Moores University |
| Main Category: | Works |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 27 February 2023 |
| Application Deadline: | 10 March 2023 |
| Procurement ID (OCID): | ocds-b5fd17-13a2ef0e-6434-4996-8e96-4750d5a76266 |
| Notice Reference: | 655c31db-34d9-4b31-8a36-56a258987829-619136 |
All 4 notices for this procurement, oldest first.
EST LJMU 22/23-024 - James Parsons 6th & 7th HVAC Upgrade Works
EST LJMU 22/23-024 - James Parsons 6th & 7th HVAC Upgrade Works
EST LJMU 22/23-024 - James Parsons 6th & 7th HVAC Upgrade Works
EST LJMU 22/23-024 - James Parsons 6th & 7th HVAC Upgrade Works
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
There is an initial known project, which is a definite requirement once this tender has been awarded. You are invited to submit the Supplier Questionnaire to access capability for the provision of replacement, of an existing HVAC system on the 6th & 7th floor of James Parsons building LJMU Liverpool John Moore's University. Please note, beyond this initial project, LJMU do not guarantee any further revenue under this agreement, however if we do have any further related projects that require these services, we will allocate to the successful bidder (with the caveat that pricing is realistic and sustainable) The proposed works involve the removal of the existing 'end of life' HVAC systems, which shall be disconnected and removed. Each of the 9nr teaching spaces will be provided with mechanical supply and extract ventilation with ducted connections to external window amendments. It is proposed the ventilation will be supplied through reduced height Mechanical Vent Heat Recovery (MVHR) units located within the suspended ceiling voids in each room, which will provide supply and extract air through a latent heat exchanger. Networked local controllers are to be included in each area, interfaced with the existing BMS system. A new AC system will be provided to all spaces through slimline four-way ceiling cassettes integrated into the suspended ceiling and connected to external units mounted at roof level. The refrigerant will be piped to the roof level though the adjacent service risers. It is proposed the LTHW radiators on the 6th floor will be removed to avoid the need to interlock the AC with the heating system. The works will include the associated BMS modifications and additions and all building work in association. Minimum Turnover The minimum annual turnover bidders must have achieved is £3m. Failure to have £3m T/O or above will result in disqualification from this procurement exercise. Additional information: This is the first stage of the tender exercise- SQ Supplier Questionnaire. Successful suppliers following stage 1 will be taken through to stage 2- ITT. Please note that the ITT is for information purposes only at this stage. Is a Recurrent Procurement Type? : No
Document pack· 1 file
Published contracts in the last 12 months
57
total contracts
£10.7m
total value
£367,914
average contract size
Typical categories
John Lennon Art & Design Building Roof Refurbishment
Liverpool John Moores University · WAC-585558
John Lennon Art & Design Building Roof Refurbishment
Liverpool John Moores University · WAC-584247
John Lennon Art & Design Building Roof Refurbishment
Liverpool John Moores University · WAC-584249
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
10 March 2023
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →