Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Amendment |
| Buyer: | Liverpool John Moores University |
| Main Category: | Works |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 27 February 2023 |
| Application Deadline: | 10 March 2023 |
| Procurement ID (OCID): | ocds-b5fd17-ffea331c-c521-4782-b3dc-a76fa00502fc |
| Notice Reference: | 9bc20c78-6d30-4bcf-9a5c-b1c184457fd4-619135 |
All 2 notices for this procurement, oldest first.
EST LJMU 22/23-020 - Byrom Street - Security Lodge
EST LJMU 22/23-020 - Byrom Street - Security Lodge
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
2.1 There is an initial known project which is a definite requirement once this tender has been awarded. You are invited to submit the Supplier Questionnaire to access capability for the provision of the strip out and refurbishment of the Byrom Street Security Lodge at LJMU Liverpool John Moore's University. Please note, beyond this initial project, LJMU do not guarantee any further revenue under this agreement, however if we do have any further related projects that require these services, we will allocate to the successful bidder (with the caveat that pricing is realistic and sustainable) The proposed works involve (but not limited to) the following: o The strip out and reconfiguration of the of existing space to suit client needs and ensure compliance with the Equality Act 2010 o The supply and installation of a new HVAC system, including allowance for a HEPA filter and then an activated carbon filter for the supply air to the MVHR unit. o Supply and installation of a secondary LV supply from an existing campus generator o Supply and installation of temporary accommodation for building users o Supply and installation of energy efficient plant options (TBC) Minimum Turnover The minimum annual turnover bidders must have achieved is ?5m. Failure to have ?5m T/O or above will result in disqualification from this procurement exercise. Additional information: This is the first stage of the tender exercise - SQ - Supplier questionnaire. Successful suppliers following stage 1 will progress on to stage 2 - ITT. Please note the ITT as this stage is for information only. Is a Recurrent Procurement Type? : No
Document pack· 1 file
Published contracts in the last 12 months
57
total contracts
£10.7m
total value
£367,914
average contract size
Typical categories
John Lennon Art & Design Building Roof Refurbishment
Liverpool John Moores University · WAC-585558
John Lennon Art & Design Building Roof Refurbishment
Liverpool John Moores University · WAC-584247
John Lennon Art & Design Building Roof Refurbishment
Liverpool John Moores University · WAC-584249
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
10 March 2023
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →