| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | Slough Borough Council |
| Main Category: | Works |
| Procurement Method: | Below threshold - open competition |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £600,000 |
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
12 June 2025
Closed
Estimated Value
£600,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (inc. VAT): | £720,000 |
| Release Date: | 14 May 2025 |
| Application Deadline: | 12 June 2025 |
| Contract Start Date: | 21 July 2025 (Estimated) |
| Contract End Date: | 30 November 2025 (Estimated) |
| Contract Duration: | 4 months |
| Award Criteria: | 60% Quality / 40% Price with weighted questions as detailed in the ITT which carry a minimum pass rate |
| Procurement ID (OCID): | ocds-h6vhtk-051362 |
| Notice Reference: | 021368-2025 |
All 2 notices for this procurement, oldest first.
SBC - Refurbishment and Reconfiguration of existing buildings. including associated Fencing, Gates, Landscaping and Parking
SBC - Refurbishment and Reconfiguration of existing buildings. including associated Fencing, Gates, Landscaping and Parking
View Original Notice
Access the full notice on the official portal
60% Quality / 40% Price with weighted questions as detailed in the ITT which carry a minimum pass rate
Our Lady of Peace is a two–form entry Primary School with Nursery provision. The school is a Catholic Voluntary Aided school within the Diocese of Northampton and has close links with the Parish of Our Lady of Peace Church in Burnham. SBC is looking to split the primary school site into two, creating two school sites instead of one. There are currently 2 main school blocks on the site (as well as various other smaller buildings). The main southern block, smaller buildings and playing fields will house the school currently using the whole site. Therefore, OLOP will go from occupying both main blocks to using only one to the south. The vacated block, to the north will be converted for use by a special educational needs school as a satellite provision. The high level brief of works to be carried out have been agreed with the schools and are set out in this document. The works will be split into phases, those that are required to get the two schools open and operational for 28th August 2025 (Our Lady of Peace) and 30th November 2025 (Arbour Vale Satellite school).
Document pack· 1 file