Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender update |
| Buyer: | CENTRE FOR ENVIRONMENT, FISHERIES AND AQUACULTURE SCIENCE |
| Main Category: | Services |
| Procurement Method: | Open procedure |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £500,000 |
| Estimated Value (inc. VAT): | £600,000 |
| Release Date: | 18 August 2025 |
| Application Deadline: | 12 September 2025 |
| Contract Start Date: | 12 October 2025 (Estimated) |
| Contract End Date: | 12 October 2027 (Estimated) |
| Contract Duration: | 2.0 years |
| Procurement ID (OCID): | ocds-h6vhtk-056661 |
| Notice Reference: | 049609-2025 |
All 4 notices for this procurement, oldest first.
CEFAS25-80 ITT for bathymetric surveys at Sizewell C for the BEEMS programme
CEFAS25-80 ITT for bathymetric surveys at Sizewell C for the BEEMS programme
CEFAS25-80 Contract for bathymetric surveys at Sizewell C for the BEEMS programme
CEFAS25-80 Contract for Bathymetric surveys Sizewell C for the BEEMS programme
View Original Notice
Access the full notice on the official portal
The BEEMS (British Energy Estuarine and Marine Studies) programme is funded by Sizewell C Limited. Through this programme, Cefas provide authoritative scientific information on the marine and transitional waters in the vicinity of potential new build nuclear power stations and require the Supplier to deliver the elements described below. The purpose of this project is to provide bathymetric data at Sizewell to assess the geomorphological changes of the region, hence contributing to the ongoing monitoring of the Sizewell Coastline. These surveys are a regulatory requirement under the Development Consent Order’s (DCO) conditions and the Coastal Processes Monitoring and Mitigation Plan (CPMMP). Cefas anticipate 4 - 6 Multibeam Echosounder (MBES) bathymetric surveys to IHO Special Order (at a minimum) within the Greater Sizewell Bay (GSB) for a 12-month period between October 2025 and September 2026 (with the option to extend for up to 4 additional years), roughly following a quarterly schedule with the potential for additional surveys subject to requirements. Exact survey dates will be agreed between Cefas and the supplier during the pre-survey kick off meetings, however the timings for surveys are dependent on construction schedules so may be subject to change at short notice. We currently expect the first survey to be required in October/November 2025, with following surveys in approximately January 2026, April 2026 and July 2026. A Core Contract will be awarded to the top ranked Supplier and up to 3 Call-Off Contracts will be awarded to the next 3 ranked Suppliers. Full details are in the Bidder Pack, available from the eProcurement system once Suppliers have registered their interest.
Document pack· 1 file
Published contracts in the last 12 months
157
total contracts
£4.3m
total value
£130,242
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
12 September 2025
Closed
Estimated Value
£500,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →