Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Buyer: | Holmes Chapel Parish Council |
| Main Category: | Works |
| Procurement Method: | Single tender action (below threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £50,000 |
| Release Date: | 27 August 2025 |
| Application Deadline: |
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
13 August 2019
Closed
Estimated Value
£50,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| 13 August 2019 |
| Contract Start Date: | 15 September 2019 (Estimated) |
| Contract End Date: | 16 December 2019 (Estimated) |
| Contract Duration: | 3 months |
| Procurement ID (OCID): | ocds-b5fd17-410806be-4a3b-4b68-a471-9d18f7f42fd7 |
| Notice Reference: | 99827490-1312-40fb-ab0c-191f750c5511-860845 |
View Original Notice
Access the full notice on the official portal
Holmes Chapel Community Centre is a Parish Council owned facility currently managed by Everybody Sport & Recreation (ES&R). It is situated east of the village centre and caters for sports and community activities. The quotation is for the repair/replacement of the designated flat roofs of the main buildings of the Holmes Chapel Community Centre. All work and materials must comply with the NFRC Safe2Torch guidance and particularly where work is undertaken near any utilities on the roof. The supplier is expected to conform with all manufacturer's specifications for the installation of products used such that the minimum 20-year guarantee on the work can be provided. (See 1.23.7 below). It is expected that as an approved supplier of a particular product specified in this bid, the manufacturer will undertake inspections during the installation process and will provide suitable reports to the parish council that these have been done and that they certify that their products have been installed successfully and correctly. At all times during the work to implement the accepted changes, full access to the Community Centre is essential to ensure the facilities fitness, café, bar and room services are not interrupted. It may be necessary to consider the current locations of some utilities, such as telecommunications, gas, electricity and water that are in situ in this roof area and may affect the required works. The Supplier is expected to take all necessary steps to ensure that no utilities (Gas, Water, Electricity) are interrupted or damaged by this work and that steps will be taken to ensure that work methods take this into account. (Note that there is a gas pipe across Roof B.) Security of the site must be maintained throughout the works and details will need to be agreed with ES&R.
Published contracts in the last 12 months
5
total contracts
£50k
total value
£50,000
average contract size
Typical categories