Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Costain Group PLC |
| Main Category: | Goods |
| Procurement Method: | — |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £5,000,000 |
| Release Date: | 25 September 2025 |
| Application Deadline: | 9 October 2025 |
| Contract Start Date: | 30 May 2026 (Estimated) |
| Contract End Date: | 7 July 2028 (Estimated) |
| Contract Duration: | 2.2 years |
| Procurement ID (OCID): | ocds-b5fd17-14d7f770-fbb3-4dde-aa6e-60e8231fdf81 |
| Notice Reference: | 307f28fa-b1c9-425f-abf7-8d0534b884a3-865413 |
View Original Notice
Access the full notice on the official portal
P1 Brackets and Cable Management System - Costain HRS02 Tunnel and Lineside M&E Scope/ What Will Be Required Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. Package 1 Brackets and Cable Management system scope associated to contract HRS02 consists of brackets and cable management systems for the route of the railway, the route being circa 180km in length, inclusive of; -Tunnel Bracketry and associated fixings -Cross Passage Bracketry and associated fixings -Ladder Rack and Associated fixings -Cable Tray and associated fixings -Trunking and associated fixings Costain require a supplier to design and supply only of the bracket and cable management system. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas. -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency All the innovation and design development must be accompanied with a rigorous approach that the technical requirements are met. Including testing where necessary. The scope of design and supply will include the following: -Support to Costain's design partner through concept and detailed design -Bracketry and Containment testing (Fatigue and Fire) -Supply of bracketry and cable management system products and the associated fixings -Provision of samples and mock ups Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to able to carry out the intended scope of works prior to completing the expression of interest.
Document pack· 1 file
Published contracts in the last 12 months
16
total contracts
£93.3m
total value
£5,828,125
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
9 October 2025
Closed
Estimated Value
£5,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →