Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | NETWORK RAIL INFRASTRUCTURE LIMITED |
| Main Category: | Services |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): |
| £24,000,000 |
| Estimated Value (inc. VAT): | £28,800,000 |
| Release Date: | 21 November 2025 |
| Application Deadline: | 9 January 2026 |
| Enquiry Deadline: | 19 December 2025 |
| Contract Start Date: | 28 June 2026 (Estimated) |
| Contract End Date: | 28 June 2029 (Estimated) |
| Contract Duration: | 3.1 years |
| Procurement ID (OCID): | ocds-h6vhtk-059b66 |
| Notice Reference: | 075984-2025 |
All 2 notices for this procurement, oldest first.
Wales & Western - Civils Examination Services (Earthworks)
Wales & Western - Civils Examination Services (Earthworks)
View Original Notice
Access the full notice on the official portal
Civil examinations within Network Rail refer to the inspection, examination and reporting of structural assets to ensure the safety, reliability, and longevity of railway infrastructure. These examinations help identify defects, monitor structural integrity, and determine necessary maintenance or repair works to prevent failures and ensure continued safe operation of the rail network. An Earthwork examination shall be sufficient to identify or determine and record information to enable Network Rail to manage the safety and performance of the Earthwork in accordance with NR/L3/CIV/065. Asset types to be examined: • Earthworks (as defined by NR/L3/CIV/065): Five chain lengths of Earthwork slope: a soil cutting, rock cutting embankment, or natural slope • Coastal and Estuarine Defences that are formed of earthworks: A Structure that protects railway infrastructure against erosion or flooding by tidal waters. It includes protection works, which protect land against erosion and encroachment by such waters, and which perform no flood defence role; and defences, which protect against flooding or attack by such waters. • Outside Party Slopes, whose failure may impact on Network Rail infrastructure, where the outside party is unable to provide a satisfactory management policy for the slope, will be, so far as is lawful, be subject to a cyclical examination. • A cutting, embankment or natural slope, outside of the Network Rail boundary, owned or managed by an outside party, which may impact on Network Rail infrastructure. Where the outside party is unable to provide a satisfactory management policy for the slope or demonstrate by other means that it is being managed in a satisfactory manner, the slope will, so far as is lawful, be subject to a cyclical examination. Examination Types: • Cyclical Earthwork Examination: These examinations are cyclical in accordance with the Task Schedule or as otherwise instructed by Employer's representative. The scope must adhere to SCHI, SEHI and/or RSHI in accordance with NR/L3/CIV/065 • Rapid Response Earthwork Examination: These examinations are for Emergency Situations as required. The scope is as required by Network Rail. • Geotechnical Incident Report: These examinations are as required by Network Rail. The scope is in accordance with NR/L3/CIV/185. Each Examination of an earthwork shall: • Include the production of a report. • Include an examination to record and report the findings related to the condition of the earthworks including all necessary preparations and arrangements for access to the earthwork. • Update and record data obtained during the examinations in the Network Rail Earthworks Database using Network Rail Earthworks Examination Software. • Support the Employer’s Representative in the management and co-ordination of examination of earthworks. • Include any vegetation clearance necessary to enable examinations of earthwork. • Provide a rapid response service to attend and report on earthwork failures and Geotechnical incidents in accordance with NR/L3/CIV/065 and NR/L3/CIV/185. In the later years of this Framework, the Geotech teams plan to move to non-traditional methods of examination. By integrating satellite data into core processes, and other observed data sets, the business can significantly reduce its reliance on traditional on-site examinations, enhancing efficiency and improving asset management decisions. Based on currently available information we are expecing the following: • CP7 Y4 50% reduction in Condition A-C assets excluding rock cuttings • CP7 Y5 70% reduction in Condition A-C assets excluding rock cuttings
Document pack· 1 file
Published contracts in the last 12 months
352
total contracts
£42555.3m
total value
£175,848,223
average contract size
Typical categories
SR41046 - Infrastructure Monitoring – Overhead Line Equipment on In-Service Vehicles (Dynamic OLE Data)
NETWORK RAIL INFRASTRUCTURE LIMITED · WAC-581905
North and East Digital Twin
NETWORK RAIL INFRASTRUCTURE LIMITED · WAC-582077
Scotland's Railway Electrification Framework
NETWORK RAIL INFRASTRUCTURE LIMITED · WAC-581331
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
9 January 2026
Closed
Estimated Value
£24,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →