Loading page content…
Loading page content…
| Source: | Find a Tender Service (FTS) |
| Buyer: | ASTER GROUP LIMITED |
| Main Category: | Works |
| Procurement Method: | Below threshold - limited competition |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 16 January 2026 |
| Application Deadline: | — |
Pipeline status
Not addedContract imported automatically · AI writes the response
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Procurement ID (OCID): | ocds-h6vhtk-060729 |
| Notice Reference: | 003694-2026 |
View Original Notice
Access the full notice on the official portal
Project: The refurbishment of the roofline including the fascia’s . soffits, guttering and downpipes and to include the stripping and safely storing for reuse the courses of tiles required to replace the 1st row of felt and batten including rafter roll and eaves support trays. Supply and install 300mm of insulation to the roof space above the communal stairwell. • NB: All roofing work to be carried out by an NFRC accredited contractor • As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works • All flats must be checked to see if there are any live gas appliances, wood burning/multi fuel stoves or open fires still in use prior to the removal of any chimney stacks. Evidence shall be provided to the Aster Surveyor who will be able to authorise this phase of work if necessary. Isolation of flues (priced separately) in line with gas protocols, removals (priced separately) to be discussed and review with client. • Aster Surveyor to advise with any blocking up and venting work as the scope of work will need to be agreed with the leaseholder/s or resident/s in advance. • Erect tubular steel scaffolding with required lifts to such elevations, including suitable access for removing the shared chimney and dismantle on completion. All scaffolding to be measured against the face of the building and to include the lift heights for a specific work type and trade. Page 5 of 15 • Remove existing tiles and safely store for reuse, remove battens, felt from the eaves course and safely lower to ground level and remove from site. • Allow for clearing all debris from the eaves and, then insulate using a 50-75mm thick PIR insulation board with a foil backing ensuring that an adequate air gap's left for ventilation. • Supply and fix new Permavent Apex breathable membrane to the cleared area area and fix new 38 x 25 mm tanalised timber battens to rafters. Reinstate the stored tiles. • Supply and fix eaves support trays G1281 by Manthorpe, including rafter roll fitted as per manufacturer’s instructions. To all roofs in contract. • Allow for supplying and fitting new deep flow guttering including downpipes, connections and associated fixtures & fittings to flat block. • Allow for supplying and fitting uPVCu fascia's, soffits. • Test guttering for leaks and adequate falls. Deliver free of dirt or imperfections. All waste material and debris will be removed from site. • Supply and lay 300mm of mineral wool insulation to the roof space above the communal stairwell • The contractor is to leave the properties and surrounding areas etc clean and clear to original condition. Wash down windows, doors, and existing/new PVCu Fascia's/soffits on completion to remove dirt & debris caused by roofing works.
Published contracts in the last 12 months
54
total contracts
£1668.0m
total value
£55,601,586
average contract size
Typical categories