| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | House of Commons |
| Main Category: | Works |
| Procurement Method: | Call-off from a framework agreement |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £25,000,000 |
| Release Date: | 17 February 2026 |
| Application Deadline: | 24 February 2025 |
| Contract Start Date: | 8 December 2025 (Estimated) |
| Contract End Date: | 27 June 2029 (Estimated) |
| Contract Duration: |
View Original Notice
Access the full notice on the official portal
The PCH M&E Lifecycle Replacement Project works are for the replacement of the life expired MEP systems throughout the building as detailed within the Scope and based on a case-by-case assessment to repair, enhance, replace, or renew each system throughout the building including heating, cooling, water, fire, and ventilation systems. The contractor is responsible for developing the design to RIBA Stage 4 specific. The contract is in two stages and allows for Early Contractor Involvement (ECI). The total contract value covers Stage 1 (ECI) (value: £5,920,669.37), and Stage 2 (partial tendered value: £18,810,958.80). The full value of Stage 2 will only be known at the end of Stage 1, once the design is complete. The estimated value of the entire contract (Stage 1 and Stage 2) is between £40m and £50m.
Published contracts in the last 12 months
3
total contracts
£100.0m
total value
£33,333,333
average contract size
Typical categories
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
24 February 2025
Closed
Estimated Value
£25,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| 3.6 years |
| Procurement ID (OCID): | ocds-b5fd17-b1e504d0-08dc-4de7-ab76-768095313a4d |
| Notice Reference: | a07ac50b-cad1-4114-8772-e3a5b0a2f076-884206 |