Bakerloo Line Upgrade Stage 1 Infrastructure Works
| Source: | Find a Tender Service (FTS) |
| Buyer: | Transport for London |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: | Planned |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 17 March 2026 |
| Application Deadline: | 22 April 2026 |
| Contract Start Date: | 8 July 2027 (Estimated) |
| Contract End Date: | 8 December 2034 (Estimated) |
| Contract Duration: | 7.5 years |
| Procurement ID (OCID): | ocds-h6vhtk-051c29🔒 BidWriter |
| Notice Reference: | 024218-2026🔒 BidWriter |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Description
The Bakerloo Line runs through London from Harrow & Wealdstone, in the North, to Elephant & Castle in the centre with plans to extend South as part of the Bakerloo Line Extension initiative. The Bakerloo line fleet (72 Tube Stock) is now the oldest rolling stock operating in the UK with considerable costs to life-extend the fleet and significant risks to reduction in reliability. TfL therefore intends to introduce the new rolling stock onto the Bakerloo Line. The BLU Stage 1 Infrastructure works are required modify and upgrading the line's infrastructure to enable the introduction of the new rolling stock with the works expected to completed by, circa 2034. The core elements of the scope include: • Reconstructing Stonebridge Park Depot to consolidate all maintenance activities. • Expanding Queen's Park Area to deliver additional stabling capacity. • Modifying London Road Sidings to retain and minimally adapt existing facilities for continued stabling usage, as well as introducing a Driver's Training Facility. • Waysides works to ensure the line's power supply, signalling systems and potentially gauging is compliant with the new rolling stock. This is a refinement of the scope presented during TfL's previous 2024 BLU Early Market Engagement with the current scope having moved the cleaning shed from London Road to Stonebridge Park and no longer required the cleaning shed at the front end of the programme. . A high-level summary of assets within the scope of this works is provided below: • DC Power • HV Power • LV power supply • Stations & Property • Platform Train Interface • Civils & Structures • Track • Signalling & communications • Depot maintenance sheds, fan roads & Stabling TfL are currently envisioning three competitions to deliver the scope. These three competitions are to appoint a: 1. Depots and Sidings Partner 2. Waysides Partner 3. Integrator
Links & Documents
Apply Online
Proceed to the official portal to submit your bid.
Pipeline status
Not addedContract imported automatically · AI writes the response
Assign to team member
Delegate this bid in BidWriter
Run Bid / No Bid analysis
Score this opportunity in BidWriter
Sign in to BidWriter to sync favourites across devices
Application Deadline
22 April 2026
13 days left
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →