WinAContractSearch
HomeContractsEnergetik Primary Heating Network Extensions Part
Back to results

Energetik Primary Heating Network Extensions Part 2 (PSDS)

WAC ID:571000
Public SectorActive25 days left
Source:Find a Tender Service (FTS)
Buyer:Lee Valley Heat Network Operating Company Limited, trading as Energetik
Main Category:Works
Procurement Method:Open procedure
Tender Status:Active
Estimated Value (ex. VAT):£12,000,000
Estimated Value (inc. VAT):£14,400,000
Release Date:19 March 2026
Application Deadline:6 May 2026
Enquiry Deadline:29 April 2026
Contract Start Date:29 June 2026 (Estimated)
Contract End Date:31 March 2028 (Estimated)
Contract Duration:1.8 years
Procurement ID (OCID):ocds-h6vhtk-066f44🔒 BidWriter
Notice Reference:025310-2026🔒 BidWriter

Ready to bid on this contract?

BidWriter AI writes your tender response in minutes — import this contract in one click.

✍️ Start writing this bid →

View Original Notice

Access the full notice on the official portal

🔒 Unlock with BidWriter

Contracting Authority

🔒 Unlock with BidWriter

Organisation

Lee Valley Heat Network Operating Company Limited, trading as Energetik

Civic Centre, Silver Street, Enfield, EN1 3XA

Contact Name:Commercial and Procurement Services
Contact Email:contact@authority.gov.uk
Website:https://procurement.authority.gov.uk
Organisation ID:GB-PPON-XXXX-XXXX

Contact details available on BidWriter

Start free trial →

Submission Details

🔒 Unlock with BidWriter
Tender Submission Deadline:6 May 2026
Enquiry Deadline:29 April 2026
Electronic Submission:Yes

Submission Instructions

https://londonboroughofenfield.my.site.com Suppliers will need to register an interest on Atamis and submit a tender submission no later than 12:0 Noon on 6th May 2026 to participate and registration is free. Tender submissions cannot be uploaded after the return deadline....

Full submission details available on BidWriter

Start free trial →

Description

Energetik is seeking to extend its Meridian Water Heat Network (MWHN) in two separate parts, known as the northern extension and western extension. The Employer will appoint a Contractor to design and build the pipe network. The western extension is from Church Street near Edmonton Green to Winchmore School and Edmonton County (Bury Campus) School. The northern extension is from Ponders End High Street near Ponders End Park to Capital College and Waverley School. The contract is a district heating pipe installation of approximately 2.4km trench length of DN200 Series 3 pipe and 1.5km trench length of DN150 Series 3 pipe, all installed with at least 800mm cover to the crown of the pipe. The majority of the pipe has been purchased by the Employer from Logstor and is being stored at Logstor, Denmark. Works include being responsible for calling off the delivery of the pipe from Logstor, purchasing all joints and associated materials from Logstor, and installing the pipe predominantly in roads or cycle paths. The pre-construction work for the contract is due to commence upon contract award on or before 30th June 2026. As well normal pre-construction work required under the contract, further GPR work, design and trial holes will be permitted as part of preconstruction. Construction work is expected to commence on or before 1st October 2026 following a successful planning application by the Employer, and subject to the Contractor agreeing S50 licences with Enfield Highways. As the project is grant funded and the grant will be lost if the contract spend does not achieve certain minimum thresholds each financial year, the contract has a sectional completion date of 31st March 2027 and Practical Completion by 31st March 2028. At least £4m of contract cost must be achieved by 31st March 2027, the sectional completion date. Completion of contract works must be delivered by 31st March 2028. Note that liquidated damages are £20,000 per day if these dates are not achieved. Key to the success of the project is the liaison with Enfield Highways team and to develop a route design and traffic management proposals that permit the granting of Section 50 licences for the works. Note that Section 50 licence fees, deposits and bonds will be paid by the Employer to Enfield Highways. Full road closures are highly unlikely to be permitted, and multiple gangs will only be permitted where it does not cause undue traffic chaos to commuter sand businesses on Enfield’s roads. The Contractor will be invited to meet Enfield Highways during the tender period. The contract includes extending the existing Logstor leak detection system, cleaning the pipe installed, hydraulically testing the pipe installed using treated water to the same standard as the existing MWHN and commissioning of the extensions to provide “heat on” to the extended network. The duration of the Contract is expected to be 21 months without option to extend due to completion of contract works must be delivered by 31st March 2028. Please refer to the Procurement Documentation for more information.

CPV Classifications2 codes — click to expand
09323000Petroleum products, fuel, electricity and other sources of energy
45232140Construction work

Links & Documents

Apply Online

Proceed to the official portal to submit your bid.

Pipeline status

Not added
Write this bid in BidWriter

Contract imported automatically · AI writes the response

Sign in to BidWriter to sync favourites across devices

Application Deadline

6 May 2026

25 days left

Estimated Value

£12,000,000

WAC Reference

WAC-571000

Updated daily

View in BidWriter

Need help writing this bid?

Our specialists write winning tender responses. Free consultation, no obligation.

Book a free consultation →