Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | Merseytravel |
| Main Category: | Works |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: | Planned |
| Estimated Value (ex. VAT): | £3,800,000 |
The contracting authority intends to procure a suitably qualified contractor to undertake refurbishment and/or replacement works to the dado panel system within the Kingsway Tunnel. The Kingsway Tunnel is a critical piece of transport infrastructure, and the existing dado panels-forming part of the tunnel lining and safety system-require upgrade to ensure continued compliance with current safety standards, durability requirements, and operational performance. The appointed contractor will be responsible for delivering a comprehensive programme of works, which is expected to include, but not be limited to: Condition Assessment and Surveys: Detailed inspection of existing dado panels, fixings, and supporting structures to determine extent of deterioration, defects, and required interventions. Design Development: Finalisation of design solutions for refurbishment and/or replacement, including materials selection, fire resistance, impact resistance, and compliance with relevant UK and EU tunnel safety standards. Removal and Installation Works: Safe removal of existing panels where required and installation of new or refurbished dado panels, including all associated fixings, supports, and interfaces with tunnel systems. Integration with Tunnel Systems: Coordination with existing tunnel infrastructure, including drainage, ventilation, lighting, and emergency systems, ensuring no adverse impact on operations or safety. Traffic and Operational Management: Planning and implementation of works to minimise disruption, including phased delivery, night-time or partial closures, and coordination with tunnel operations. Health, Safety, and Compliance: Adherence to all relevant health and safety legislation, including working in confined spaces and live highway environments, with robust risk management procedures. Environmental Considerations: Management of waste, materials, and environmental impacts in line with applicable regulations and sustainability objectives. Testing, Commissioning, and Handover: Inspection and verification of installed systems, ensuring compliance with specifications and provision of as-built documentation. The works will be delivered in a highly constrained operational environment, requiring careful planning, stakeholder coordination, and experience in similar tunnel or highway infrastructure projects. This procurement seeks to appoint a contractor with proven expertise in tunnel refurbishment, highway infrastructure works, and installation of specialist panel systems. The project outputs will contribute to the long-term safety, resilience, and operational efficiency of the Kingsway Tunnel.
Published contracts in the last 12 months
67
total contracts
£58.1m
total value
£2,324,451
average contract size
Typical categories
Oakdale Road and Chisenhale Street Solar Farm's
Merseytravel · WAC-591442
KW Toll plaza Feasibility Study / Scope
Merseytravel · WAC-591466
The Appointment of a Specialist Engineering Contractor to develop under an ECI period the detailed remedial works to 8 Ventilation Stations across the Mersey Tunnels Estate and carry out those remedial works
Merseytravel · WAC-588224
Pipeline status
Not addedContract imported automatically · AI writes the response
Estimated Value
£3,800,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (inc. VAT): | £4,750,000 |
| Release Date: | 1 May 2026 |
| Application Deadline: | — |
| Contract Start Date: | 1 December 2026 (Estimated) |
| Contract End Date: | 30 November 2027 (Estimated) |
| Contract Duration: | 1.0 years |
| Procurement ID (OCID): | ocds-h6vhtk-06905f |
| Notice Reference: | 040553-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal