Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | The Mayor and Commonalty and Citizens of the City of London |
| Main Category: | Services |
| Procurement Method: | — |
| Tender Status: | Pre-tender |
| Estimated Value (ex. VAT): | £200,000 |
| Estimated Value (inc. VAT): | £240,000 |
| Release Date: | 18 May 2026 |
| Application Deadline: | 8 June 2026 |
| Contract Start Date: | 31 August 2026 (Estimated) |
| Contract End Date: | 31 October 2029 (Estimated) |
| Contract Duration: | 3.3 years |
| Procurement ID (OCID): | ocds-h6vhtk-069ad3 |
| Notice Reference: | 045287-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
The requirement is to develop an overarching furniture strategy and bespoke designs for the Barbican Centre through the following stages: • An analysis of the proposed use of the Foyers, Conservatory, Learning Spaces, Sculpture Court and Lakeside in close consultation with the Barbican Renewal design team and using the RIBA Stage 4 design as a basis to classify types of spaces, zones, likely users and shifts at different times of the day and week, for example: o Comfortable, informal seating that can be easily moved and reconfigured for flexible use of spaces o Ergonomic design including for individuals with mobility challenges that is integrated in general seating areas o Furniture for quiet, individual work o Furniture for communal gathering o Moveable/ foldable/ stackable furniture for events held in different spaces o This analysis should also make recommendations for where bespoke or off the shelf products are most appropriate, taking into account the relationship to the Centre’s architecture, budgetary and user experience considerations. • Where agreed with the Client, bespoke design of new Furniture befitting of the Barbican Centre’s identity and history. The Furniture must: o Enhance the outcomes of the Renewal projects through complementing the Barbican Centre’s design heritage, responding to user needs and demonstrating careful coordination and consultation with the Barbican Renewal Design and Client Team. o Be innovative in minimising whole-lifecycle carbon o Demonstrate holistic inclusive design across the site o Meet the relevant British Standards for furniture • A strategy for re-use of existing furniture and incorporation in overall design site wide. • Prototyping of bespoke items. • Recommendation for off the shelf furniture products, where appropriate, to ensure successful integration into site-wide design approach • Oversee manufacture and installation on site • Creation of guidelines to ensure the furniture is used and stored as intended, via a limited set of iterations and layouts.
Published contracts in the last 12 months
626
total contracts
£12276.8m
total value
£62,636,540
average contract size
Typical categories
Integrated Facilities Management (IFM) Framework
The Mayor and Commonalty and Citizens of the City of London · WAC-600986
Project Jumpstart to Success (GLA’s UKSPF)
The Mayor and Commonalty and Citizens of the City of London · WAC-600308
Future Ready Programme: Strategic Partner for Transformation
The Mayor and Commonalty and Citizens of the City of London · WAC-596975
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
8 June 2026
17 days left
Estimated Value
£200,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →