Loading page content…
Loading page content…
| Source: | Find a Tender Service (FTS) |
| Buyer: | Kishorn Port Limited |
| Main Category: | Works |
| Procurement Method: | Restricted procedure |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £15,000,000 |
| Release Date: | 19 September 2024 |
| Application Deadline: | 11 October 2024 |
| Procurement ID (OCID): | ocds-h6vhtk-049c5e |
| Notice Reference: | 030067-2024 |
Kishorn Port Limited own and operate the Dry Dock facility at Kishorn. The existing Dry Dock is to be enlarged by forming a cutting 100m long and 60m wide into the rock foreshore. The rock material blasted and removed will be used to reclaim 8.5 hectares of foreshore land to the east of the Dry Dock. Access roads are to be repositioned around the new works. The Contractor will design the blasting elements of the Works.
Document pack· 1 file
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
11 October 2024
Closed
Estimated Value
£15,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →