Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Buyer: | Kilnbridge Construction Services Ltd |
| Main Category: | Services |
| Procurement Method: | — |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £50,000 |
| Release Date: | 13 March 2025 |
| Application Deadline: | 20 March 2025 |
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
20 March 2025
Closed
Estimated Value
£50,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Contract Start Date: | 25 January 2026 (Estimated) |
| Contract End Date: | 30 June 2028 (Estimated) |
| Contract Duration: | 2.5 years |
| Procurement ID (OCID): | ocds-b5fd17-d775e603-cebe-4b4e-9094-38f91d2fab89 |
| Notice Reference: | 069fcecc-9578-4ff7-af98-4a9b5cde834b-833563 |
View Original Notice
Access the full notice on the official portal
Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for Fit-Out of the Portal and Ancillary Buildings. Those buildings include the following: • South Portal • DNO Substation • West Core • East Core • North Portal • Train Crew & Catering Building • Cycle Hub • Security Booth The package includes a range of Multiple services: • Painting & decorating (Soffits, walls, floors) • FF&E of Offices • kitchenettes cupboards • Sanitaryware • IPS units • Ceilings • Tiling walls • Flooring finishes • Screed The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for manufacture, supply and testing (if req'd). The Subsubcontractor will be responsible for progressing the schedule and associated detailed drawings for manufacture and installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements. Expected Subsubcontract award TBC Construction is to be carried out over a 2.5-year period commencing in Q1 2026 and completing in late Q2 2028. Multiple visits will be required over this period.
Document pack· 1 file
Published contracts in the last 12 months
4
total contracts
£1.9m
total value
£462,500
average contract size
Typical categories