Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Phoenix M E Ltd |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £250,000 |
| Release Date: | 10 May 2024 |
| Application Deadline: | 17 May 2024 |
| Procurement ID (OCID): | ocds-b5fd17-720e03cd-2e5a-4c76-84d8-4f6d9a158bf4 |
| Notice Reference: | 3c50696b-4f8d-43cc-818e-a12c6b608675-750085 |
View Original Notice
Access the full notice on the official portal
The Sub-subcontractor shall provide a complete installation of the HV Commissioning Supply Transformer and housing, associated HV Circuit Breaker, LV Switchgear, PFC units and Cast Resin Busbar for the Westgate Vent Shaft Asset (Project). 11kVar HV Transformer & HV Switch The Sub-subcontractor shall supply, install, test & commission the 11kVar Commissioning Power Supply Transformer and associated HV Circuit Breaker generally as identified on the Commissioning Power Supply Schematic Drawing and within the MEP Particular Specification and Equipment Data Reports. The Transformer and HV Circuit Breaker shall be delivered to site in accordance with the programme requirements & positioned by a specialist plant movement company under the control of the Sub-subcontractor. PLC SYSTEMS The Sub-subcontractor shall Design, supply, test & commission the PLC system generally as identified on the LV Schematic Drawings and within the MEP Particular Specification and Equipment Data Reports. The PLC system shall be located within Switchboard SB-LV-A-01. It shall control the operation of the Incoming Supply and Busbar link ACB's to both Main Switchboards (SB-LV-A-01 & SB-LV-01-B) to ensure they can never be dual feed. PFC UNITS The Sub-subcontractor shall Design, supply, install, test & commission of the Power Factor Correction (PFC) units generally as identified on the LV Schematic Drawings and within the MEP Particular Specification and Equipment Data Reports The Power Factor Correction Units are remote units and are required for the following Switchboards, SB-LV-A-01 SB-LV-B-01 LV Switch panels The Sub-subcontractor shall Design, supply, install, test & commission the LV Switch panels generally as identified on the LV Schematic Drawings and within the MEP Particular Specification and Equipment Data Reports. There are 6 no. Switchboards, and they are as follows, SB-LV-A-01 SB-LV-B-01 SB-UPS-A-01 SB-UPSB-01 SB-MCC-X-01 SB-SLV-X-01 CAST-IN RESIN BUSBAR The Sub-subcontractor shall Design, supply, install, test & commission of the Cast Resin Busbar System as generally as identified on the LV Schematic Drawings and within the MEP Particular Specification and Equipment Data Reports The Cast Resin Busbar carries the Electrical supply from the Rail Services Transformers to their associated Main LV Switchboards. There is an interlinking Cast Resin Busbar between the Main LV Switch panels.
Document pack· 1 file
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
17 May 2024
Closed
Estimated Value
£250,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →