Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Chesterfield Canal Trust Ltd |
| Main Category: | Works |
| Procurement Method: | Restricted procedure (above threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £4,500,000 |
| Release Date: | 29 June 2023 |
| Application Deadline: | 1 August 2023 |
| Procurement ID (OCID): | ocds-b5fd17-a4d7e002-84f2-476f-be0b-54b77545ea66 |
| Notice Reference: | d268f4a2-885c-4523-8e37-254687aec3b8-658024 |
All 3 notices for this procurement, oldest first.
Chesterfield Canal Trust - Main Contractor
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
The Client, the Chesterfield Canal Trust (CCT), aims to promote the full restoration and appropriate development of the Chesterfield Canal. At the height of its dereliction, the canal had been reduced from a navigable length of 46 miles and 65 locks to only 26 miles and 16 locks. Since 1989, 12 miles and 37 locks have been restored, with only a 8.5-mile gap between Staveley and Kiveton remaining. In 2019, the UK Government launched the Towns Fund, a scheme whereby 101 towns around the country were invited to bid for up to £25m for regeneration projects. Staveley was selected as one of those towns to receive funding and a portion of the £25m was dedicated to the canal restoration. Scope of Scheme This procurement process is in relation to the canal restoration works that extend from Staveley to the Doe Lea Valley and include the following: • The design and construction of a new bridleway bridge (including abutments) for the Trans-Pennine Trail (TPT Bridge), • The detailed design and construction of an earthwork embankment to form the new canal channel for c850m, including water supply, • The detailed design and construction of a new lock structure (Railway Lock), • The detailed design and construction of a new vehicular bridge structure (Bellhouse Bridge), • The detailed design and construction or upgrades of 3km of footways and bridleways, including those to the TPT Bridge, • All necessary 'temporary works' design and installation associated with all of the above The contract will be a Design and Build, NEC4 Engineering and Construction Contract (ECC), Option A. This is a two-stage process: Stage 1 - Pre-Qualification Questionnaire (PQQ) Stage 2 - Invitation to Tender (ITT) Stage 1 will select 6 contractors to be invited to proceed to Stage 2. The Stage 1 tender process and PQQ has been compiled in accordance with PAS 91:2013+1:2017. The tender documents are available from Matthew Miles. His contact details are: Email: matthew.miles@edgeps.co.uk Mobile: 07467 902200 Please also CC Jon Lindley in all correspondence. His contact details are: Email: j.lindley@chesterfield-canal-trust.org.uk Mobile: 07891624755
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
1 August 2023
Closed
Estimated Value
£4,500,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →